Pictoral of the house with the colour selection

There is a light....I can almost see it!

At the end of May we were told we would have PCI at end June, hand over and moving in Mid July. The end of June has come and gone and our SS has advised us there is a few problems with the painter. We are now looking at 2nd or 3rd week in July for PCI and probably first week of August for hand over.

Craig went to the house on Friday as we were advised not much had been done. The main thing was to take a look at the front porch and steps. We paid alot of money (2.5k) and we expected the porch and steps to look like the internal access steps. We received a call from our SS asking us if we were going to tile them, we said 'No, we were just going to leave it cement to match in with the drive way' (we thought it was going to be nice smooth concrete). The following day our SS called back and said the concrete is very rough and would need to be tiled. The porch is now going to be tiled, care if Masterton! Thanks for fixing this up :-)

On the flip side there was heaps done!! Balcony rails installed, tiling finished, first internal coat of paint tidyed up, water tank delivered. And the plumber that wasnt supposed to start till Tuesday was there. We were very lucky craig showed up on site as the plumber was about to leave. The plans he had said 'Leaver tapwear' and the taps delivered were normal taps. Craig rang me to double check what we had selected and the taps on site were correct. The plumber stayed a little longer and installed the taps. Problem solved!!

Internal access steps, Nice!

Front Porch :-(

Balcony
Ensuie Tiles





Main bathroom tiles


Tapware
Water tank